Woman-Owned • Minority-Owned

Compliance and Risk Pre-Flight

Evaluators Cannot Score a Proposal They Have Already Rejected

Compliance is not a quality standard. It is a threshold requirement. A proposal that fails to comply with Section L's formatting, page limit, or submission instructions can be rejected before a single evaluator opens the technical volume. The proposal does not have to be bad. It just has to be non-compliant. And under FAR Part 15, agencies have upheld rejection on grounds as specific as a proposal that was one page over the stated limit or submitted one minute past the deadline.

Small businesses lose this way more often than they lose on technical merit. CIG's compliance pre-flight is designed to close that gap before it costs you an award.

Our Solutions

What CIG's Capture Support Covers

Close-up of classical architectural columns with ornate building facade in the background

Who This is For

This service is designed for small and diverse-owned contractors that are already performing on at least one federal contract and need a more disciplined, repeatable approach to building their next layer of federal revenue. If your BD strategy is primarily reactive, if you find out about opportunities after they post, or if your pipeline is thin heading into a fiscal year-end, this is where CIG starts.

What You Can Expect

A realistic, prioritized pipeline built for your actual capabilities. A repeatable capture rhythm that does not require a large in-house BD organization to sustain. And a clear picture of where your firm is positioned to win before a single proposal dollar is spent.

Prefer to see the full range of CIG services first?